
From split systems to large chilled hot water systems, our qualified pipe fitting and millwright crews will get your system up and running the first time. Again, with the aid of the 3D Cadd Design system and the 14,000 sq. ft. pipe fabrication facility; IMS will fabricate the piping systems before the concrete is poured.